PLN 35,000 MW ACCC INSTALLATION

(The Installation of 150.6mm^2 ACCC Helsinki size conductor to span the Banda Sea from Baruta, Muna Island to Bau-Bau, Buton Island)
Powered by Kabelindo’s Bare Conductor
Supported PT Kelinci Mas Unggul